GCE was chosen to perform removal of the existing one 5,000-gallon gasoline underground storage tank with associated piping along with investigate/verify the conditions of soil/groundwater and installation of one 5,200-gallon diesel aboveground storage tank, associated piping and pumping system as designed for a police precinct in Yonkers, New York. All work has been performed according to applicable regulatory standards.